« Participating Units and Command Structure | Main | Signing off »

November 9, 2004

Sustainment Hypothesis

Marine engineers and/or Seabees could have constructed a bridge across the Euphrates to the west of the city on its outskirts -- possibly at the narrow bend in the Euphrates, before it turns north again. Via this route, they are pushing sustainment to a Support Area of some size near the edge of the northern part of the city -- possibly the seized train station. The logistics route probably links Al-Taqqadam Airfield with the MEK Compound east of the city.

This is much safer and less of a bottleneck than pushing sustainment across the seized bridges.

Posted by Chester at November 9, 2004 12:30 AM

Trackback Pings

TrackBack URL for this entry:
http://www.theadventuresofchester.com/MT/mt-tb.cgi/446

Comments